| Before, during and after pictures bathroom remodel | |||||||||||
![]() |
|||||||||||
|
Before: old faucets, mildewed edges, single piece plastic walls. After: New faucets, 6x6 white tiles What was done: Tear out existing plastic walls, tear out wet rotted drywall behind it, repair rotted 2x4s, new Wonderboard and tile. The existing water lines had to be changed to accomodate new faucets, which was a good thing because the existing lines were all corroded. |
|||||||||||
|
|
|||||||||||
![]() |
|||||||||||
![]() |
|||||||||||
![]() |
|||||||||||